A- A A+

News

AMMC: results for 4 months of the year 2021

on . Posted in news

The growth rate for the processing of copper raw materials amounted to 100.3%, including MOF – 100.3%, MOF-2 – 100.5%, the forecast for the content of copper in concentrate was fulfilled by 104.4% (103.9%), including MOF – 103.5% (105.5%) and MOF-2 – 109.1% (96.2%).

For 4 months of this year, copper cathode produced 101.2% (growth rate 101.8%), including from own raw materials – 100.7% (102.7%). Zinc metal produced 105.3% (growth rate 94.3%), including from own raw materials – 104.5% (100.0%). Sulfuric acid produced 106.2% (104.0%), including Copper-smelting plant – 102.2% (102.5%), ZP – 137.7% (114.1%).

The targets for the extraction and processing of polymetallic ore by the Khandiza mining department in January-April were fulfilled by 100.0% (growth rate 104.2%) and 100.4% (105.3%), the zinc content in zinc concentrate was 121.3 %.

Extraction of gold ore was carried out: AMD – by 105.8% (growth rate 98.4%), ChMD – by 103.4% (96.8%), Kauldy mine - by 100.8% (75.5%), its processing – by 104.8% (98.1%), 106.4% (106.2%), 100.5% (78.4%), respectively.

Copper sulfate was produced 100.0% (growth rate 97.1%), enamel wire – 100.0% (102.6%), technical selenium – 100.0%, technical tellurium – 100.0%, ammonium perrhenate – 137, 9%, copper pipes – 121.7% (115.8%), molybdenum trioxide – 121.6 (123.9%).

Information service

 

Click to listen highlighted text! Powered By GSpeech